SEKISOVSKOYE MINE

The Sekisovskoye deposit is located in a large industrial area of Kazakhstan near the regional center of Ust-Kamenogorsk (Oskemen). This is a well-explored gold deposit with favorable mining conditions and significant exploration potential at the existing indigenous source and from neighboring sites.
100K OZ/YR

Targeted run-rate
production for ~9 years
3.47 MOZ

Total in-site contained proved reserves of Gold (JORC 2012)
2008 YEAR

Start of open pit production
2011 YEAR

Start of underground production
The Sekisovskoye deposit was discovered in 1833 and surface mining was carried out from 1833 to 1847, from 1932 to 1935, and from 1943 to 1946. From 1975 to 1986, a complex of exploration work was carried out. Between 1978 and 1982, the artel "Altai Gold" of the Ministry of Non-Ferrous Metallurgy of the KazSSR introduced mining in the area of an oxidized primary source.
In 2003, Hambledon Mining (later renamed Altyn Plc) owned further exploration work. The process and open - pit mining began in 2008. Today, the mining rights at the Sekisovskoye deposit belong to the 100% subsidiary DTOO GRP Baurgold, and the processing plant is owned by a 100% subsidiary of GMK Altyn MM LLP.
STATUS
The mine is in operation since 2008. The ore reserves for open-pit mining were completed at the end of 2016. The underground work began in 2011 and is currently increasing with a target production level (Stage 1) of 100,000 ounces per year.
OPERATIONAL DATA
PROJECTED CAPITAL EXPENDITURES UNDERGROUND OPERATIONS

Total

US$m

2019

US$m

2020

US$m

2021

US$m


Prospect Drilling

3.3

0.3

1.5

1.5

Underground development

5.6

2.0

1.6

2.0

Infrastructure

3.4

-

3.4

-

Ore handling facilities

21.9

6.0

13.6

2.3

Teren-Sai - exploration program

4.9

1.7

1.6

1.6

Contingency

8.3

1.7

4.5

2.1

Total

47.4

11.7

26.2

9.5


MINING - PROCESSING
 

2018

2017


Crushing

KT

340

332,5

Milling

KT

348,1 

332,9

Gold grade

g/t

1.68

1.88 

Silver grade

g/t

2.5

2.5

Gold recovery

%

83.2

83.5

Silver recovery

%

74.3

73.8

Contained gold

koz

18,3

20,0

Contained silver

koz

27,9

27,1

Gold poured

koz

15,2

16,7

Silver poured

koz

20,7

19,9


MINING - UNDERGROUND
 

2018

2017


Ore mined

KT

278,883

287,389

Gold grade

g/t

1.95 

2.08

Silver grade

g/t

2.92

2.80 

Contained gold

koz

17,482

19,243

Contained silver

koz

26,110 

25,909


LOCATION